Develop a network drawing for Hill construction and determine the critical path. How long is the project expected to take?

Southwestern University Traffic Problem and Southwestern University Stadium construction problem

Case studies:

Case Studies Southwestern University: (A)*

Southwestern University (SWU), a large state college in Stephenville, Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents.

A longtime football powerhouse, SWU is a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking, in 2003, SWU hired the legendary Bo Pitterno as its head coach.

One of Pitterno%u2019s demands on joining SWU had been a new stadium. With attendance increasing, SWU administrators began to face the issue head-on. After 6 months of study, much political arm wrestling, and some serious financial analysis, Dr. Joel Wisner, president of Southwestern University, had reached a decision to expand the capacity at its on-campus stadium.

This integrated study runs throughout the text. Other issues facing Southwestern%u2019s football expansion include (B) forecasting game attendance (Chapter 4); (C) quality of facilities (Chapter 6); (D) break-even analysis for food services (Supplement 7 Web site); (E) location of the new stadium (Chapter 8 Web site); (F) inventory planning of football programs (Chapter 12 Web site); and (G) scheduling of campus security officers/staff for game days (Chapter 13).

Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Pitterno had argued the need for a first-class stadium, one with built-in dormitory rooms for his players and a palatial office appropriate for the coach of a future NCAA champion team. But the decision was made, and everyone, including the coach, would learn to live with it.

TABLE 3.6 Southwestern University Project

The job now was to get construction going immediately after the 2009 season ended. This would allow exactly 270 days until the 2010 season opening game. The contractor, Hill Construction (Bob Hill being an alumnus, of course), signed his contract. Bob Hill looked at the tasks his engineers had outlined and looked President Wisner in the eye. %u201CI guarantee the team will be able to take the field on schedule next year,%u201D he said with a sense of confidence. %u201CI sure hope so,%u201D replied Wisner. %u201CThe contract penalty of $10,000 per day for running late is nothing compared to what Coach Pitterno will do to you if our opening game with Penn State is delayed or canceled.%u201D Hill, sweating slightly, did not need to respond. In football-crazy Texas, Hill Construction would be mud if the 270-day target was missed.

Back in his office, Hill again reviewed the data (seeTable 3.6) and noted that optimistic time estimates can be used as crash times. He then gathered his foremen. %u201CFolks, if we%u2019re not 75% sure we%u2019ll finish this stadium in less than 270 days, I want this project crashed! Give me the cost figures for a target date of 250 days%u2014also for 240 days. I want to be early, not just on time!%u201D

Discussion Questions

1

. Develop a network drawing for Hill construction and determine the critical path. How long is the project expected to take?

2.

What is the probability of finishing in 270 days?

3.

If it is necessary to crash to 250 or 240 days, how would Hill do so, and at what costs? As noted in the case, assume that optimistic time estimates can be used as crash times

§ Southwestern University Traffic Problems.” How can the concepts with Network Modeling lead you to develop effective solutions to the two associated Discussion Questions.?

§ Southwestern University Stadium Construction.”

§ How can the concepts of Project Management lead you to develop effective solutions to the three associated Discussion Questions?

§ How can the concepts of Project Management lead you to develop effective solutions to the three Associated Discussion questions located on page 496

§ Use any tables, graphs, or charts that you deem necessary to support your response

/40

Organization / Development

Points Earned

Additional Comments:

1. Paragraph transitions are present, logical, and maintain the flow throughout the paper.

2. Sentences are complete, clear, and concise.

3. Sentences are well constructed, strong, and varied.

4. Rules of grammar, usage, and punctuation are followed

5. The tone is appropriate to the content and assignment.

6. A conclusion was included

7. Spelling is correct

/30

Mechanics

Points Earned

Additional Comments:

1. The paper is in APA format

2. The paper was at three to four pages.

3. All sources, including the textbook, should be cited and referenced using APA format.

/30

Use the order calculator below and get started! Contact our live support team for any assistance or inquiry.

[order_calculator]